A. 11.50 kw
B. 12.60 kw
C. 11.25 kw
D. 12.10 kw
Correct Answer:
Option C – 11.25 kw
Explanation
Power = (work done)/time taken = (mgh)/t
= (750 x 10 x 90)/60 = 11250w = 11.25kw
A. 11.50 kw
B. 12.60 kw
C. 11.25 kw
D. 12.10 kw
Correct Answer:
Option C – 11.25 kw
Explanation
Power = (work done)/time taken = (mgh)/t
= (750 x 10 x 90)/60 = 11250w = 11.25kw